I was Surprised How Poor Of Condition The Box Was After Removing The Plastic Box L:iner
All The Cross Support Are Rotted Away
Temporary Flat Bed To Keep Going With
I am sending this email to let you know that there will be some work done on Red Squirrel Road causing the road to be inaccessible for 1 – 2 hours tomorrow, April 14th. A crossdrain has failed at 1km and must be replaced to keep the water moving under the road rather then over it.
Thanks and have a great day!
Moose Lake Is Out
Bay Lake Almost All Gone
April 11, 2021