Open House April 16th & 17th For Logging and Road Building Plans For the Next Ten Years
REVIEW Review of Proposed Operations: Information Centre Temagami Management Unit 2019-2029 Forest Management Plan The Ontario Ministry of Natural Resources and Forestry (MNRF), First Resource Management Group and the Temagami Local Citizens’ Committee (LCC) invite you to an information centre. This information centre is being held as part of the detailed planning of operations for the ten-year period of the 2019–2029 Forest Management Plan (FMP) for the Temagami Management Unit. The Planning Process The FMP takes approximately three years to complete. During this time, five formal opportunities for public consultation and First Nation and Métis community involvement and consultation are provided. The second opportunity (Stage Two) for this FMP occurred November 8, 2017 to December 7, 2017 when the public was invited to review and comment on the long-term management direction. This ‘Stage Three’ notice is: • To invite you to review and comment on: -the details of access, harvest, renewal and tending operations for the ten-year period of the plan, and -the proposed primary and branch road corridors and the proposed operational road boundaries for the ten-year period of the plan, and • To request contributions to the background information to be used in planning. How to Get Involved To facilitate your review, information centres will be held at the following locations from 4:00 p.m. to 8:00 p.m. on the following days: April 16, 2018 at the Temagami Community Centre & Arena, 100 Spruce Drive, Temagami, ON P0H 2H0 April 17, 2018 at the New Liskeard Golf Clubhouse, 804027 Golf Course Road, New Liskeard, ON P0J 1P0 The following information may be obtained at the information centre: • Summary of the MNRF Regional Director preliminary endorsed long-term management direction; and • Summary map(s) of: -the planned areas for harvest, renewal and tending operations for the ten-year period of the plan; and -the proposed corridors for new primary and branch roads for the ten-year period of the plan. In addition to the most current versions of the information and maps which were available at Stages One and Two of the public consultation, the following information will be available at the information centre(s):
100% purchase of Cameron Cobalt Project in Ontario
Historic grab sample of 2.26% Co and 1.7 g/t Au
No royalty
LOCATION
The Cameron Cobalt Project is located in Brigstocke Township approximately 20 kilometers southwest of Cobalt, Ontario and 120 kilometers north of North Bay, Ontario. The property consists of 4 claim units covering an area of 64 hectares hosting the past exploration pits and a shaft of the Cameron target developed in the 1950’s which is now closed.
Geological and claim map of Cameron Cobalt Project
GEOLOGICAL SETTING
Geologically the Cameron Cobalt property is located within the Cobalt Embayment in the Southern Province of the Canadian Shield where Huronian Supergroup sedimentary rocks lay unconformably overly Archean basement rocks. Both the Huronian sediments and Archean rocks have been intruded by Proterozoic-aged Nipissing diabase occurring as both sills and dykes.
The Cameron property claims covers the contact between the Proterzoic sediments of the Lorrain and Gowganda formation of the Huronian Supergroup and the intrusion of the Nipissing Diabase. The mineralization model for the property is the “Five Element Vein” style of mineralization (Co-Ag-Ni-Bi-As), which is characteristically found with 250m of the diabase contact. This is the characteristic cobalt silver mineralization found throughout the Cobalt, Silver Centre and Gowganda mining camps.
RESOURCE
A grab sample collected in 1987 from the historical Cameron pits and analyzed by the Ontario Geological Survey returned assay values of 2.26% Co and 1.7 g/t Au. (Data Source is file MDI31M05SW00021 from the Ontario Mineral Deposit Inventory).
PLANNED EXPLORATION
The project was acquired from an Ontario prospecting group for a single payment of $10,000 Canadian with no royalty payment.
This acquisition is in keeping with Canyon’s philosophy to continue to seek quality projects in low risk jurisdictions at good value. This is Canyon’s third cobalt project in Ontario along with Munro-Warden and Samuels Lake, all of which will be part of the 2018 exploration program.
Location Map showing Canyon Copper projects in Ontario