Thursday, 22 December 2016

First Day Sleddin In



Moose Were Out Wandering Around Last Night 4 Sets Of Tracks In All On The Way In



Sunday, 11 December 2016

Winter is Comin



                     The Lake May Have Froze Last Night


Wednesday, 16 November 2016

Fall Chores

 Time for some new fabrene on the portable ice hut
 A Cil tune up was also in order
Even the inside got a coat . Many thanks to my neighbours for the help .
This Balsum is trying to get in the woodshed to hang out with the Birch and Maple

Thursday, 10 November 2016

Huntin Trip

I try to do the loop at the end of the Rabbit Lake Road every year . Today was the day .



                              Rabbit Lake above and below






                                Camp site on Rabbit Lake







    


                        Matabichawan Chutes top and bottom







Rabbit Lake at sand dam . A drill was working to the left of picture checking the soil in the embankment .




Sunset on trip back out the road





Sunday, 16 October 2016

Main Road Gets Haircut






                                 The Mean Machine






Wednesday, 15 June 2016

Maiden Voyage Take Two


First Trip Lets See How It Goes











As You Can See Things Didn't Goes As Hoped







After Getting a New Belt and Two Loads Later All the Pails are Home




Monday, 16 May 2016

There Going To Try Again



INFORMATION

PLEASE BE ADVISED THAT EACOM TIMBER CORPORATION (ELK LAKE OPERATION) WITH THE ASSISTANCE OF THEIR CONTRACTOR WILL BE ACTIVELY MOVING HEAVY EQUIPMENT AND HAULING LOGS USING THE RED SQUIRREL AND EYE LAKE ROADS BEGINNING ON OR ABOUT MAY 17, 2016 FOR A PERIOD OF APPROXIMATELY 2 WEEKS WEATHER PERMITTING.
HAULING AND MOVEMENT OF HEAVY EQUIPMENT COULD BE 24 HOURS PER DAY AND 7 DAYS PER WEEK.
PLEASE FORWARD YOUR INQUIRIES TO:

KYLE AIRD
WOODLANDS MANAGER,
ELK LAKE WOODLANDS
705-678-2120 EXT. 222


WE ENCOURAGE ALL USERS OF THESE ROADS DO SO WITH EXTREME CAUTION.